Fichten solar park
ENERPARC AG's Fichten solar park is located in the Franconian Alb (Bavaria). The plant covers an area of 22.18 hectares and went into operation in December 2018 (first construction phase) and February 2020 (second construction phase). With a row spacing of 2.3 to 2.4 metres, the row spacing is relatively small. The paths are gravelled. The shape of the system adapts to the relief.

ENERPARC AG
20.1 MW
22.2 ha
2020
Bavaria
49.2024736635 - 11.8141491183
Arable land
Table of contents
Species groups | Investigated |
---|---|
Plants | ✔ |
Locusts | ✔✔ |
Butterfly | ✔ |
Dragonflies | |
Reptiles | ✔ |
Amphibians | |
Birds | |
Bats | |
Miscellaneous |
✔ = Investigation carried out on behalf of the operators
Natural environment and special features
Franconian Alb
In addition to arable land, the site is bordered by some mixed woodland. A small area of forest is enclosed by the plant on its northern and eastern sides. The US military training area Hohenfels is located around two kilometres north of the Fichten solar park.
The site is located in the Franconian Alb at 460 to 490 metres above sea level in a small valley. The relief slopes down towards the centre of the site. There are elevations around the site.
This is a former arable farmland. A row of trees and shrubs mapped as biotopes was excavated and relocated.
Floor
Rendzina / brown earth rendzina / pararendzina from slope debris over limestone, marl and dolomite rocks alternating with shallow brown earth over terra fusca / terra fusca-parabrown earth from silty-clayey over-deposition products of limestone weathering
Clay slurries
Construction method
0.6
2.3m
0.9m
20°
6 pieces
The frame is secured to the ground by means of ram posts with cross struts.
Monofacial modules were installed.
Gravel paths were laid in the area.
Management
The Fichten solar park is grazed. The plant is divided into sub-areas and each is subjected to impact grazing.
Equalisation measures
The following compensatory measures were carried out in spruce trees:
- Planting measures
- Extensive grassland development through self-vegetation
- An area equalisation of 4.6 hectares was implemented on the site of the solar park.
Details of the measures can be found in section 13.3 of the explanatory memorandum to the development plan, including the environmental report.