Wörnitzhofen solar park
The Wörnitzhofen solar park was commissioned in May 2018 and is operated by Wattmanufactur. The ground-mounted PV system is located around one kilometre north of Weitlingen in Bavaria, on an area that was previously used intensively for agriculture.
The Wörnitzhofen solar park was designed with particularly large module row spacing of 6.19 metres.
As in all Wattmanufactur solar parks, extensive cultivation is also practised in the Wörnitzhofen plant. By consistently avoiding the use of fertilisers and pesticides, the soil quality is maintained. In addition, ground-nesting birds and insects are protected by adjusting the mowing times and using double-blade mowing technology.

Wattmanufactur GmbH & Co. KG
8.6 MW
18.8 ha
2018
Bavaria
49.0478709474 - 10.4439642287
Arable land
Table of contents
Species groups | Investigated |
---|---|
Plants | ✔ |
Locusts | ✔ |
Butterfly | ✔ |
Dragonflies | |
Reptiles | |
Amphibians | |
Birds | ✔ |
Bats | ✔ |
Miscellaneous |
✔ = Investigation carried out on behalf of the operators
Natural environment and special features
Franconian Keuper-Liasland
The site is surrounded on three sides by agricultural land, with a local road running to the west. Field paths run along the north and east sides of the site. The nearest wooded area is about 500 metres to the west. The river Wörnitz runs about 500 metres to the south.
The Wörnitzhofen solar park has an undulating terrain with a predominantly south-easterly and north-easterly slope. It is located at around 450 metres above sea level.
Arable land
Floor
Pelosol brown earth / Pelosol pseudogley from weathering products of marl and clay rocks
Silt clay
Construction method
0.25
6.2m
5.1m
15°
4 pieces
20mm
The frames are anchored to the floor with two pile-driving posts that are cross-braced to the module tables.
The modules are polycrystalline.
The pathways are made from recycled cable sand, recycled concrete, recycled masonry and mineral concrete.
Management
The area is mowed once or twice a year using a double-bar blade. Further maintenance measures include the care of woody plants. Partial grazing by sheep is planned.
Equalisation measures
The following measures were to be implemented as part of the development plan:
Extensive grasslandExtensive permanent grassland with characteristic species inventory is to be developed, cared for and permanently maintained (mowing or grazing), mowed material is to be removed
Woody plantingContinuous planting with a width of at least five metres on all sides of the construction site, native trees and shrubs appropriate to the location, maintain as they grow and replace if they fail, minimum quality: shrubs without root balls, plant size 60-100 cm with 5-8 shoots, the types of trees and shrubs were specified
Green stripGrassland strips adjacent to woodland planting within the area are to be developed with characteristic species and mowed; mown material is to be removed. Mowing must be carried out no more than twice a year.
CEF measure on the southern sub-areaLark windows with fallow land or extensive meadow management
The compensatory measures were implemented immediately after completion of the park.
Test results
Further documents
Development plan and environmental report
Development plan and environmental report for the Wörnitzhofen solar parkSurvey report on birds, butterflies and grasshoppers (Schlumprecht, 2023)
Survey report on birds, butterflies and grasshoppers (Schlumprecht, 2023) Wörnitzhofen solar parkPreliminary avifaunal survey of the construction site
Preliminary avifaunal survey of the Wörnitzhofen solar park construction siteEcological measures
Ecological measures Wörnitzhofen solar park